Beaver Walk & Bridge-Building

Day 20

We had an early start this morning as the plan was to get out for a hike with the Beaver Scouts and do a bit of bridge building. So we were out of the house at 9:15 to meet up for a 9:30 start. It was a bit of a gray drizzly morning but it wasn’t too wet or cold so every was reasonably happy.

We did the first half of the walk without incident although there were a few wet feet due to somewhat inadequate footwear. However, nothing too bad happened. We all stopped at the usual resting spot, had a bit of a snack and myself and one of the other leaders made up a simple rope-crossing between two trees so that the lads could try out a very basic bridge. That was a bit of fun and we continued on after that.

We decided we had enough time to build a slightly more permanent bridge so we set to and found a few logs to build a bridge across a ditch. The lads were able to help at this and we had a great time at it. We finished this off with a rope tied between trees as a hand-rail and made a nice little crossing

DSCN0124

After that, we finished off the walk without too much incident although we did spot a few frogs in one of the streams on the way back which was quite nice for the lads. We finished off crossing the stile I built back in the summer. I must add a couple more of these throughout the forest. This picture was taken earlier in the week on a slightly less grey day.

DSCN0070

Leave a Reply

Your email address will not be published. Required fields are marked *